Loading...
Way History: Raccordement de Migne-Auxances (199523890)
Version #1
ajout de la LGV SEA
Tags
construction_end_expected | 2017-01-01 |
---|---|
construction_start_expected | 2012-01-01 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
highspeed | yes |
importance | national |
loading_gauge | TSI_GC |
maxspeed | 160 |
name | Raccordement de Migne-Auxances |
operator | SNCF Réseau |
passenger_lines | 2 |
railway | rail |
railway:bidirectional | regular |
railway:etcs | 2 |
railway:kvb | yes |
railway:preferred_direction | backward |
railway:track_ref | 1 |
ref | 570360 |
ref:FR:SNCF_Reseau | 570360,1,R1MA,0.000,6.159 |
source | BDOrtho IGN |
source:date | 2018 |
start_date | 2017-07-02 |
usage | main |
voltage | 25000 |
Nodes
Welcome to OpenHistoricalMap!
OpenHistoricalMap is an interactive map of the world throughout history, created by people like you and dedicated to the public domain.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenHistoricalMap and contributors, under an open license |