Loading...
Way History: Raccordement Fontaine Le Comte Sud (199523818)
Version #1
ajout de la LGV SEA
Tags
construction_end_expected | 2017-01-01 |
---|---|
construction_start_expected | 2012-01-01 |
covered | yes |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
highspeed | yes |
importance | national |
layer | -1 |
loading_gauge | TSI_GC |
maxspeed | 200 |
name | Raccordement Fontaine Le Comte Sud |
operator | SNCF Réseau |
railway | rail |
railway:bidirectional | regular |
railway:etcs | 2 |
railway:kvb | yes |
railway:preferred_direction | backward |
railway:track_ref | VR2FS |
ref | 538310 |
ref:FR:SNCF_Reseau | 538310,1,VR2FS,0.000,4.002 |
source | BDOrtho IGN |
start_date | 2017-07-02 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 2102187577 (part of way Raccordement Fontaine Le Comte Sud (199524191))
- 2102185903 (part of way Raccordement Fontaine Le Comte Sud (199524107))
Welcome to OpenHistoricalMap!
OpenHistoricalMap is an interactive map of the world throughout history, created by people like you and dedicated to the public domain.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenHistoricalMap and contributors, under an open license |