Loading...
Way History: ligne de Boulogne sur Gesse (198653192)
Version #1
correction halte La Sabatière
Tags
bridge | yes |
---|---|
electrified | no |
end_date | 1949-12-31 |
gauge | 1000 |
layer | 1 |
name | ligne de Boulogne sur Gesse |
operator | CFSO (compagnie des chemins de fer du Sud-Ouest) |
railway | narrow_gauge |
start_date | 1900 |
Nodes
2 nodes
- 2093439168 (part of way ligne de Boulogne sur Gesse (198652692))
- 2093439167 (part of way ligne de Boulogne sur Gesse (198653191))
Welcome to OpenHistoricalMap!
OpenHistoricalMap is an interactive map of the world throughout history, created by people like you and dedicated to the public domain.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenHistoricalMap and contributors, under an open license |