Loading...
Way History: 198298207
Version #2
Western Wake Expressway Phase IX from US 64 in Apex to NC 55 in Holly Springs was opened Dec 20, 2012. Added the freeway and ramps with this start date. Veridea Parkway interchange opened Apr 3, 2017 added.
Tags
highway | motorway_link |
---|---|
oneway | yes |
start_date | 2012-08-01 |
Nodes
19 nodes
- 2088082593
- 2088082594
- 2088082595
- 2088082596
- 2088082597
- 2088082598
- 2088082599
- 2088082600
- 2088082601
- 2088082602
- 2088082603
- 2088082604
- 2088082605
- 2088082606 (part of way 198298225)
- 2088083178 (part of way 198298222)
- 2088082607
- 2088082620 (part of way 198298208)
- 2088082608
- 2088082609 (part of ways Triangle Expressway (198298209) and Triangle Expressway (198298220))
Version #1
Western Wake Expressway Phase VIII from NC 55 (Cary and Morrisville) to US 64 in Apex was opened Aug 1 2012. Added the freeway and ramps with this start date.
Tags
highway | motorway_link |
---|---|
oneway | yes |
start_date | 2012-08-01 |
Nodes
18 nodes
- 2088082593
- 2088082594
- 2088082595
- 2088082596
- 2088082597
- 2088082598
- 2088082599
- 2088082600
- 2088082601
- 2088082602
- 2088082603
- 2088082604
- 2088082605
- 2088082606 (part of way 198298225)
- 2088082607
- 2088082620 (part of way 198298208)
- 2088082608
- 2088082609 (part of ways Triangle Expressway (198298209) and Triangle Expressway (198298220))
Welcome to OpenHistoricalMap!
OpenHistoricalMap is an interactive map of the world throughout history, created by people like you and dedicated to the public domain.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenHistoricalMap and contributors, under an open license |